Maruti Suzuki records highest-ever rail dispatches in 2025
The move has also helped reduce road congestion and dependence on fossil fuel imports, it said.

Hisashi Takeuchi, MD & CEO of Maruti Suzuki India, said 2025 marked a milestone for the company’s logistics operations.
“The year 2025 marks our highest-ever rail dispatch… During the year, we strengthened our green logistic efforts through two landmark events – inauguration of India’s largest automobile in-plant railway siding at our Manesar facility, and second was we dispatched vehicles by rail to Kashmir valley through the world’s highest railway arch bridge over Chenab river, a first by any automobile manufacturer.”Takeuchi said the company’s mid-term goal is to increase rail-based vehicle dispatches to 35% by FY2030-31 as it works towards aiding India’s net-zero ambition by 2070.
“Maruti has adopted a comprehensive ‘Circular Mobility’ approach to sustainability, aiming to reduce its carbon footprint across the entire vehicle lifecycle—from design and production to logistics and end-of-life vehicle (ELV) management”Maruti was the first automobile company to obtain an AFTO (Automobile-Freight-Train-Operator) license, back in 2013.
Since FY 2014-15, it has transported over 28 lakh vehicles from 22 destinations servicing over 600 cities pan India through a hub and spoke model.Currently, the company uses over 45 flexi deck rakes, each with a capacity of carrying around 260 vehicles per trip.In CY 2025, rail dispatches from Maruti Suzuki’s in-plant railway siding at Gujarat and Manesar facility accounted for 53% of the Company’s total rail dispatches.